Home > Term: kritická cesta
kritická cesta
The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project.
- Jenis Kata: noun
- Industri / Domain: Perangkat lunak
- Kategori: Sistem operasi
- Company: Microsoft
0
Penulis
- Aptrans
- 100% positive feedback