Home >  Term: D-day materiel readiness gross capability
D-day materiel readiness gross capability

As applied to the D-to-P concept, this capability represents the sum of all assets on hand on D-day and the gross production capability (funded and unfunded) between D-day and P-day. When this capability equals the D-to-P materiel readiness gross requirement, requirements and capabilities are in balance.

0 0

Penulis

  • Lucrezia
  •  (Gold) 3125 poin
  • 100% positive feedback
© 2024 CSOFT International, Ltd.