Home >  Term: procurement lead time
procurement lead time

The interval in time between the initiation of procurement action and receipt into the supply system of the production model (excludes prototypes) purchased as the result of such actions. It is composed of two elements, production lead time and administrative lead time.

0 0

Penulis

  • Lucrezia
  •  (Gold) 3125 poin
  • 100% positive feedback
© 2024 CSOFT International, Ltd.