Home > Term: single-minute exchange of dies
A series of techniques pioneered by Shigeo Shingo for changeovers of production machinery in less than 10 minutes. The long-term objective is always zero setup, in which changeovers are instantaneous and do not interfere in any way with continuous flow. Setup in a single minute is not required, but used as a reference.
- Jenis Kata: noun
- Industri / Domain: Manajemen kualitas
- Kategori: Six Sigma
- Organization: ASQ
0
Penulis
- asquser
- 100% positive feedback
(Minneapolis, United States)