Home >  Term: war reserve materiel requirement
war reserve materiel requirement

That portion of the war materiel requirement required to be on hand on D-day. This level consists of the war materiel requirement less the sum of the peacetime assets assumed to be available on D-day and the war materiel procurement capability.

0 0

Penulis

  • Lucrezia
  •  (Gold) 3125 poin
  • 100% positive feedback
© 2024 CSOFT International, Ltd.