Home > Term: Power ascension
Power ascension
The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.
- Jenis Kata: noun
- Industri / Domain: Energi
- Kategori: Batu bara; Gas alam; Bahan Bakar
- Company: EIA
0
Penulis
- Harry8L
- 100% positive feedback
(London, United Kingdom)